Sectors
Finance, Insurance and Real Estate carries the financial cost of climate hazards such as flooding, and that needs address-level data to price, insure and protect assets against them.

Lenders: Know which mortgages sit on streets that flood.
The problem.
Banks must identify, assess and manage physical climate risk across their lending books: in Israel under Bank of Israel Directive 345, in force since June 2026, and in the EU under ECB and EBA supervisory expectations.
Commercial flood scores describe an area, not an address, and assume drainage capacity instead of modelling the actual network.
What we will provide.
Flood depth and arrival time for each property, by API or file, ready for collateral valuation, PD and LGD models and stress tests.
The data comes from the physical network and terrain, not from borrower records. It is designed to run beside your current provider as an independent second opinion.
Layer: 4 · Risk Data · Roadmap.

Insurers: Price flood hazard by the street, not the postcode.
The problem.
A Flat flood pricing produces adverse selection: premiums are too low on streets that flood and too high on streets that do not.
What we will provide.
A building-level flood index for underwriting. A backtest on a storm you already know: the model's prediction set against your actual claims.
The output is flood hazard, meaning depth and arrival time;
conversion to loss is on the roadmap. Later, warnings to policyholders ahead of a storm, through FloodOS.
Layers: 4 · Risk Data · Roadmap, and 1 · Drainage Model · Delivered, for the backtest.

Real-Estate:
Not just a risk score. What it costs to fix.
The problem.
A score does not tell an owner whether to acquire, upgrade or sell, and it does not price the fix. Underground parking, plant rooms and basements carry the exposure, and investors expect asset-level physical-risk assessment, for example in GRESB reporting.
What we will provide.
A site report with flood depth and arrival time at your building and its access routes. On top of it, a Planning Scenario: the tested measure, such as detention volume, a drainage connection or a blue roof, and its estimated cost, so the decision is priced before acquisition or works.
Layers: 4 · Risk Data · Roadmap, and 2 · Planning Scenarios · Delivered.